Call Karen Caunce 01254 296 010

Search:


Case Study: Eldon Street, Oldham


For this local authority housing estate in Greater Manchester, Vital Energi replaced an aging energy infrastructure with a new heating distribution mains, which entailed a minimum disruption installation and a surveillance system that prevented any future breakdowns and ensured reliability for the housing estate.

  • Increase quality of life for residents
  • Better reliability and security
  • Reduced impact on environment
  • Minimum disruption on residents