Call a Vital Energi Expert on 01254 296 000

Media Resources

Media Resources

Vital Energi Video Gallery

Browse our gallery of Vital Energi Product videos. Filter your selection using the drop-down below:

Filter Videos OR

Vital Energi Image Gallery

Browse our gallery of Vital Energi Product images. Filter your selection using the drop-down below:

Filter Images OR
  1. Sustainnable woodchip fuel used at Glenshellach, Oban. Biomass Fuel
  2. Sustainable affordables homes built at Glenshallach, Oban. Affordable Homes
  3. Energy Efficient Biomass Boilers installed at Glenshellach, Oban. Biomass Boiler
  4. Energy Cente at Glenshallach Oban Energy Centre
  5. Installation of Preinsualted Pipework at BAA Terminal 5 BAA Pipework (1)
  6. Preinsulated Pipework at BAA Terminal 5 BAA Pipework (2)
  7. Preinsulated Pipeowrk at BAA Terminal 5 BAA Pipework (3)
  8. Unloading Preinsulated Pipework at Heathrow's Terminal 5 BAA Pipework (4)
  9. Old Boiler in Blackpool Hospital Energy Centre Blackpool Hosp Old Boiler
  10. Gas fired boiler installed through confined spaces Boiler Installation
  11. Blackpool Victoria Hospital building Blackpool Victoria Hospital
  12. Installing the boiler into the energy centre at Blackpool Hospital Installing the new boiler
  13. Unloading the new gas fired boiler at Blackpool Hospital Unloading the new boiler
  14. Band Muff Fusion Welding exclusive to Vital Energi, carried out at the Bonnyrigg Estate Band Muff Joint
  15. 330kWe gas fired CHP engine used at Bonnyrigg Estate CHP unit
  16. Preinsulated pipe at Bonnyrigg Estate Bonnyrigg pipework
  17. Monitoring energy centre system Energy Centre System
  18. Thermal store at Bonnyrigg Estate Thermal Store
  19. A gas fired CHP system was provided at Bourbon Lane Bourbon Lane Estate
  20. A gas fired CHP system was provided at Bourbon Lane Bourbon Lane Estate
  21. A gas fired CHP system was provided at Bourbon Lane Bourbon Lane Estate
  22. VE designed and installed the energy centre for Capital East Capital East Tower Block
  23. VE designed and installed the energy centre for Capital East Capital East Development
  24. 850KW gas fired boilers used at Capital East Gas Fired Boilers
  25. Internal view of energy centre at Capital East Energy Centre
  26. Consort Road Estate Consort Road
  27. Consort Road Estate Consort Road
  28. Vital Aqua Varm Hydraulic Interface Unit installed in the Consort Road dwellings Vital Energi HIU
  29. Point Of Sale Unit was installed in the resident's local shop at Consort Road Point of Sale Unit
  30. Prepayment Meter situated in each dwelling at Consort Road Prepayment Meter
  31. Coopers Road Apartments Coopers Road Apartments
  32. Gas fired CHP unit at Coopers Road CHP Unit
  33. Internal view of energy centre at Coopers Road Energy Centre
  34. Gas Fired Boilers at Coopers Road Gas Fired Boilers
  35. Coopers Road Housing Estate Coopers Road Estate
  36. VE designed and installed the energy centre at Elektron Elektron Development
  37. Internal view of the energy centre at Elektron Energy Centre
  38. 1000kW gas fired boilers installed at Elektron Gas fired boilers
  39. The energy centre and the CHP scheme provided heat and electricity to the Elektron tower blocks Elektron Tower Blocks
  40. Clayfields tree planting ceremony Clayfields Event
  41. The Clayfields is an eco-friendly residential development Clayfields Property
  42. VE designed, supplied andinstalled the energy centre and the district heating scheme which provided heating and hot water to the estate Clayfields Property
  43. Wood pellet boiler installed at Clayfields Clayfields Biomass Boiler
  44. VE designed, supplied and installed the energy centre and pipe network at the Greenwich Millenium Village Greenwich Millenium Village
  45. VE supplied and installed Vital Aqua Varm HIU's into each of the dwellings Greenwich Millenium Village
  46. VE designed, supplied and installed a remote meter reading network at the Greenwich Millenium Village Greenwich Millenium Village
  47. Vital Aqua Varm HIU installed in each dwelling at Greenwich Millenium Village Vital Aqua Varm HIU
  48. VE designed, supplied and installed the energy centre for the Grosvenor Waterside project Grosvenor Waterside building
  49. Gas fired CHP unit installed at Grosvenor Waterside Grosvenor Waterside CHP
  50. Gas fired boilers installed at Grosvenor Waterside Grosvenor Waterside boilers
  51. Gas fired CHP installed at Grosvenor Waterside energy centre Grosvenor Waterside CHP
  52. Band Muff Fusion Welding exclusive to Vital Energi being carried out on Kings Cross scheme Kings Cross pipework
  53. Installing preinsulated pipe at Kings Cross Kings Cross preinsulated pipe
  54. District heating pipe at Kings Cross Kings Cross pipe
  55. Unloading pipe at Kings Cross Kings Cross pipe
  56. Installed preinsulated pipe at Kings Cross Kings Cross pipe
  57. Biomass boilers at Lasswade Road energy centre Lasswade Road Biomass boilers
  58. Energy centre at Lasswade Road Lasswade Road energy centre
  59. Lasswade Road Estate Lasswade Road
  60. Vital Aqua Varm HIU installed in each dwelling at Lasswade Road Estate Lasswade Road HIU
  61. Installing biomass boiler into energy centre at Lasswade Road Lasswade Road Biomass Boiler
  62. Wood pellets used to fuel biomass boiler at Lasswade Road Wood pellets used at Lasswade Road Estate
  63. Lasswade Road Estate Lasswade Road
  64. External view of Lerwick energy centre Lerwick waste to energy scheme
  65. External view of the energy recovery plant Lerwick energy centre
  66. Internal view of Lerwick energy centre Lerwick energy centre
  67. Swimming pool connected to the Lerwick district heating scheme Swimming pool connected to Lerwick system
  68. Band muff fusion welding at Liverpool University Pipework installation at Liverpool University
  69. Band muff fusion welding, exclusive to Vital Energi in the UK Liverpool University band muffing
  70. Grinding pipework at Liverpool University Liverpool University district heating scheme
  71. Preinsulated pipe installed at Liverpool University Liverpool University pipe
  72. The district heating network distributed heat to the campus buildings Liverpool University
  73. This 520kWe gas fired CHP engine provides heat and hot water to the Charles Dickens Estate Charles Dickens Estate CHP
  74. 2 gas fired boilers installed to provide heat and hot water to Charles Dickens Estate Gas fired boilers at Charles Dickens Estate
  75. Vital Aqua Varm HIU installed in each dwelling at Charles Dickens Estate to provide heat and hot water instantly HIU Installed at Charles Dickens Estate
  76. 70m3 thermal store installed at Charles Dickens Estate Charles Dickens thermal store
  77. Vital Energi installed the district heating network to serve the 8 housing blocks, the arts and leisure centre and 2 schools Charles Dickens Estate tower block
  78. The hospital now receives lower heating bills due to the recycling of heat that is generated by the CHP engines Mayday CHP engine
  79. The heat from the CHP is captured and re-used by the LTHW boilers to provide heat and hot water Boiler installed at Mayday Hospital Energy Centre
  80. Bespoke control system installed by Vital Energi for the Energy Centre Control system installed at Mayday Hospital
  81. Vital Energi was awarded the Operation and Maintenance contract for the hospitals energy centre Maintaining the boilers at Mayday Hospital
  82. The PC allows the operator to monitor and control the infrastructure within the energy centre Mayday Control System
  83. External view of the energy centre Mayday Hospital Energy Centre
  84. External view of the energy centre and hospital Mayday Hospital Energy Centre
  85. Mayday Hospital, front entrance Mayday Hospital
  86. McNeil Road district heating pipework McNeil Road Pipe
  87. Vital Energi installed the preinsulated pipework between March and June 2008 MediaCityUK Development
  88. The BBC and Salford University are moving into phase 1 of MediaCityUK MediaCityUK Phase 1
  89. Vital Energi have designed and installed the unique tri-generation energy centre MediaCityUK Phase 1
  90. Installing the Flue at MediaCityUK energy centre Flue Installation at MediaCityUK
  91. Band Muff Fusion Welding carried out on the Middleton district heating scheme Middleton district heating scheme
  92. Fusing the district heating joints together at Middleton Middleton Band Muff Fusion Welding
  93. Excavating trench for the district heating pipework Middleton district heating trench
  94. Absorption Chillers in the Natural History Museum energy centre Natural History Museum absorption chillers
  95. Vital Energi designed and installed the tri-generation scheme at the Natural History Museum Natural History Museum
  96. Vital Energi installed a 1.8MWe CHP engine which made a significant reduction to the NHM's CO2 emissions Natural History Museum CHP engine
  97. In 2007 the CHPA Gala dinner was held in the NHM's Central Hall Natural History Museum Central Hall
  98. Vital Energi exhibit the energy centre at NHM to the CHPA guests Natural History Museum hosts the CHPA Gala dinner
  99. NHM gas fired boilers Natural History Museum Boilers
  100. Internal view of the NHM tri-generation energy centre Natural History Museum Energy Centre
  101. Vital Energi constructed a bridge for the pipework to run along at the Canal Street Diversion project in Nottingham Nottingham District Heating Scheme
  102. The exclusive Band Muff joint system carried out at Eldon Street will increase the pipes life expectancy by 30 years Eldon Street District Heating Scheme
  103. Vital Energi designed, supplied and installed the preinsulated pipework at Eldon Street Vital Energi installed preinsulated pipe at Eldon Street
  104. Welding the joints together at Eldon Street Eldon Street District Heating Pipework
  105. The Eldon Street district heating scheme is connected to 225 houses Eldon Street Preinsulated Pipe
  106. Welding the joints together at Eldon Street Eldon Street Preinsulated Pipe
  107. Parkside is the first development to be built by the Key London Alliance Parkside Development
  108. 450kW gas fired boilers were installed in the Parkside energy centre Parkside Boilers
  109. Vital Energi's Hydraulic Interface Units were installed in each dwelling Parkside HIU
  110. The boilers were installed through confined spaces and carefully placed into position in the energy centre Installing the boiler at Parkside
  111. Preinsulated pipe installed at Warminster MOD Warminster pipework
  112. Preinsulated pipe installed at Warminster MOD Warminster pipework
  113. The Ross Crescent biomass boiler is fuelled by woodchips Ross Crescent Boiler
  114. External view of the Ross Crescent energy centre Ross Crescent Energy Centre
  115. Vital Energi repaired and modified the existing district heating mains network at Ross Crescent Ross Crescent Estate
  116. Vital Energi designed, supplied and installed the energy centre at the Royal Arsenal Development Royal Arsenal Apartments
  117. External view of Royal Arsenal energy centre Royal Arsenal energy centre
  118. Internal view of Royal Arsenal energy centre Royal Arsenal Energy Centre
  119. Gas fired boilers installed in the Royal Arsenal energy centre Royal Arsenal Boilers
  120. Vital Aqua Varm hydraulic interface unit's were installed in each dwelling of the Royal Arsenal development Royal Arsenal HIU
  121. Inside the gas fired boiler at the Royal Arsenal energy centre Royal Arsenal Boiler
  122. Vital Energi installed the Band Muff Fusion Welding joint system which is exclusive to Vital Energi in the UK Sheffield District Heating Scheme
  123. The Band Muff Fusion Welded Joint System extends the pipes life span by 30 years Sheffield Band Muffing
  124. Over the last 22 years Vital Energi have installed over 44km of specialist pre-insulated pipe in Sheffield City Centre Sheffield City Centre
  125. Vital Energi has connected 140 public and private buildings to the district heating network including the City Hall Sheffield City Hall
  126. Grinding the joints on the Sheffield City pipework Sheffield District Heating pipes
  127. Installing the pre-insulated pipe in Sheffield Sheffield Pipework
  128. Pipe system installed in Sheffield Sheffield Pipeline
  129. Vital Energi connected the BBC Radio building to the incinerator situated at Bernard Road BBC Radio Sheffield Building
  130. Vital Energi designed and installed a biomass district heating scheme which provides heat and hot water to the 3 college buildings Sabhai Mor Ostaig (SMO) Gaelic College
  131. Delivery of the biomass boiler to the SMO College energy centre SMO Biomass Boiler
  132. The design of the district heating network allows buildings to be connected to the system at a later date Pipework at SMO College
  133. Lowering the 500kW biomass boiler into the SMO College energy centre Lowering the biomass boiler
  134. Gas fired boiler installed in the Strawberry Vale energy centre Strawberry Vale Boiler
  135. Vital Energi was appointed to carry out the design, upgrade and replacement of the energy centre Strawberry Vale Estate
  136. Vital Energi employed a full time dedicated resident liaison officer (RLO) to liase and co-ordinate with all residents on the estate to ensure a smooth and efficient communication service Strawberry Vale Estate
  137. Internal view of the Strawberry Vale energy centre Strawberry Vale Energy Centre
  138. Vital Energi were also responsible for the upgrade and replacement of the underground district heating pipe network and the internal heating works to all properties on the estate Strawberry Vale Energy Centre
  139. Vital Energi was appointed to provide a turnkey heating solution for this urban landmark development Tachbrook Triangle
  140. Vital Energi upgraded the system from steam to a more energy efficient low temperature hot water system University College London Hospitals
  141. Heat Plate Exchangers installed in the energy centre by Vital Energi UCLH Energy Centre
  142. Vital Energi installed the new LTHW system into the Mortimer Market building UCLH Building
  143. AHU pressurisation unit installed in the UCLH energy centre Inside the UCLH Energy Centre
  144. The biomass wood shavings are stored on the top floor of the two storey energy centre Woodbrook Energy Centre
  145. Vital Energi designed and installed the energy centre and includes four biomass boilers which has helped reduce homeowners fuel costs by around 60% Woodbrook Biomass Boilers
  146. The plant and equipment is situated on the basement level of the energy centre Woodbrook Energy Centre
  147. Vital Energi worked with the M&E consultants to re-engineer the design of the energy centre. The two storey design is the first of its kind in the UK Woodbrook Energy Centre
  148. Vital Energi designed and installed a biomass community heating network which connects to 358 homes as part of phase 1 of the scheme Woodbrook Estate
  149. Vital Aqua Varm HIU's were installed into each dwelling on the Woodbrook Estate. A pre-payment system has also been installed to reduce residents consumption rates Woodbrook HIU
  150. Vital Energi have also been awarded the operation and maintenance contract which will be carried out on the entire heating system WoodBrook Official Opening
  151. The Band Muff fusion welded joint system is exclusive to Vital Energi in the UK and extends the pipes life span from 30 to 50 years York University Band Muffing
  152. Vital Energi's specialist pre-insulated pipe was installed York University Pipe
  153. Vital Energi are responisble for the underground multi-utilities corridor which will link the new 116-hectare Heslington East extension with the Universities existing Heslington West campus York University Pipe
  154. Vital Energi have installed new mains cold water and gas pipework as well as external telecommunications ducting and chambers facilitating new communications connections to serve the Heslington East campus York University Trench
  155. Vital Energi were also responsible for the Civil and M&E works associated with the project York University Excavating the Trenches
  156. Vital Energi supplied and installed Vital Aqua Varm HIU's and heat meters into each dwelling Viridian Estate
  157. Vital Energi's heat meters can be maufactured into the HIU's and can gather accurate readings for electricity, gas, water and heat Viridian HIU and Heat Meter
  158. The Vital Aqua Varm HIU provides central heating and hot water instantly on demand Viridian HIU
  159. Vital Energi were commissioned to carry out the design, supply, installation and operation & maintenance of the energy centre and the HIU's The Arc Development
  160. The biomass heating system is fed with locally produced wood pellets providing renewable energy to a level of 10% of the energy demand across the project The Arc Biomass Boiler
  161. Lowering the biomass boiler into the energy centre The Arc Biomass Boiler
  162. Vital Energi's highly efficient gas fired boilers The Arc Boilers

Email this page to a colleague

Enter your email address:

Enter your colleague's email address:




Email a Vital Energi expert

Email a member of our expert Vital Energi team with your community energy query and they will get back to you as soon as possible.


Stephen Jefferies

Enter your question*

Your name*

Company name

Your email*

Confirm your email*