Executive Summary

The University of Strathclyde created "The Strathclyde Commitment" which was a range of initiatives designed to enhance the socio-economic benefits from the delivery of their £20m energy project. We worked closely with them to maximise local and regional budget spend, employment and training opportunities as well as working with local schools and embedding education at the heart of the project.

  • about
    3 x 12 week work placements created
  • graduates
    10 apprentices hired
  • billing
    71% of budget spent locally
  • reducing-carbon (1)
    £65m in energy savings over life cycle of the project

Project Overview

The University of Strathclyde is investing £1billion pounds over a 10 year period to improve its campus and create an ideal working and learning environment for students and staff.  As part of this work we have created a £14.5m project to refurbish their existing John Street Boiler House, introducing CHP Technology, new boiler and thermal stores and a campus-wide district heating network.

To ensure the local economic and social benefits are maximised, the University created The Strathclyde Commitment which clearly set out a series of spending, employment and social measures which it expected the winning contractor to meet as well as inviting them to suggest additional initiatives which would benefit the community.  These were formally submitted as part of the tender process.

Our Solution

Vital Energi Strathclyde University 132

Whilst we have developed our supply chain and sub-contractors over decades, with a strong focus on health and safety and quality, we constantly try to expand this to incorporate smaller, local businesses to realise social and economic benefits.  In the initial stages, smaller and medium sized enterprises may not necessarily have the H&S standards we require or the resources to meet other requirements.  Our approach has adopted a national standard, using the ‘Safe Contractor’ and meaning any investment in accreditation results in more benefits the supplier than the single project.  Additionally, Safe Contractor provides a learning and improvement platform for smaller organisations to develop and implement improved standards.

We have engaged with local supply chain at the earliest possible opportunity, educating them about the work packages available and supporting them to meet the nationally recognised industry benchmarks.

On this project we carried out a well-publicised, dedicated supply chain event.  These were run by the people who would be directly involved in the project and included senior Quantity Surveyors, Commercial Managers, Project Directors and H&S Directors who could describe both the opportunities and the requirements.

The presentations described a range of work packages on offer and covered various disciplines such as mechanical contractors, water treatment and commissioning, BMS, insulation, builders, demolition, mechanical and electrical suppliers, pump manufacturers, ventilation.

Whilst introducing potential supply chain to our H&S standards is important, providing ongoing assessment and support is essential to a successful project.  Our SHEQ director supported engagement from the pre-construction phase and oversaw a range of measures which included full system compliance and competency audits, through to regular monthly meetings and site performance reviews.  By recognising that smaller companies may not have the dedicated staff or expertise necessary for a large, multi-contractor site we were able to help several companies work on the project who would not previously have been able to.  This allowed us to increase the percentage of the budget spent locally and exceed the target figure.

Solution detail

The total economic impact of the University of Strathclyde’s Combined Heat and Power project on the Scottish economy is anticipated to be £12.5 million in 2018/19 prices. Of this GDP impact, £5.2 million is related to direct spending. The spill-over effects on the supplychain of the CHP project add an additional £3 million to GDP. The remaining £4.3 million of GDP isgenerated by the spending of wages paid as a result of the CHP project and its supply chain.

, The Fraser of Allandar Institute

Key Benefits

The Strathclyde Commitment

Download Case Study The Strathclyde Commitment Case Study 0.29 Mb
Related case study

University of Edinburgh

University of Edinburgh Utilities Supply Company