Work is now complete on our Mechanical Infrastructure and Mechanical Fit Out package for Berkeley’s prestigious West End Gate development, which is situated near Marylebone and Little Venice.
The development comprises four blocks – B, D, E and F which are part of the Affordable Houses and Asquith House blocks. Blocks B and D contain 108 apartments over 10 storeys, whilst blocks E and F are made up of 108 apartments set over 18 floors. The ground floors of each of the four blocks consist of retail spaces and striking entrance lobbies, and the development boasts first-class resident facilities, including a cinema room, private gym, swimming pool and spa.
We delivered essential infrastructure and apartment fit outs across each of the four blocks, which included the installation of low temperature hot water and boosted cold water services within each property, fitting of Heat Interface Units (HIUs), along with chilled pipework, flat duct, internal plumbing, and sprinkler pipework. All wet riser systems, fire stopping systems, and smoke extracts systems have all been fitted and tested t
Apartments have now been handed over to Berkeley Homes, and residents have turned each dwelling into a home.