Berkeley Homes, St Edward

Royal Warwick Square

Executive Summary

Berkeley St Edward’s Royal Warwick Square development is a collection of prestigious 1, 2 & 3-bedroom properties with private leisure facilities in the Royal Borough of Chelsea and Kensington. With our long-standing relationship with Berkeley spanning 15 years, and previous experience working with the developer on similar schemes, we were awarded the project and tasked with adapting their energy scheme. Vital have been awarded six contracts to date, totaling £26m.

  • stats-numerical
    £26m contract value
  • HIU
    213 HIU's
  • buildings
    211 Properties

Project Overview

Vital Energi began the project with an adaption of Royal Warwick Square development’s existing energy centre, which included two boilers and a 210kWe CHP engine, as well as the installation of a new chiller plant room at basement level and associated roof mounted plant, with a view to rectify the existing energy centre so that it works more efficiently.

We are providing the complete Mechanical & Electrical infrastructure installation across three phases of the development, which will involve the completion of the entire shell and core, and fit-out for 211 apartments. This includes 2 leisure facilities, including gyms and pools, and the double basement car park.

We have installed low temperature hot water, chilled water, boosted cold water, low voltage distribution systems and data systems from the basement plant rooms to each apartment. We’ve also installed all domestic hot and cold-water services, and heating and cooling systems to each property, the leisure suite and communal areas. Each apartment will benefit from the installation of their own HIU and fan coil units which provide heating and cooling.

Our Solution

Vital 21 7 007

Blocks E & H of the Kensington Row phase all have leisure facilities, and the works have been developed in line with the construction design.

  • Orcomm home automation system with concierge integration
  • Wireless Access Point
  • Apartment fire suppression systems
  • Water leak detection within all bathrooms, kitchens and mechanical cupboards
  • Fire stopping solution in conjunction with St Edwards’ site operating procedures
  • Viega Pipework including smart press within all apartments
  • Flues
  • Pumps duties
  • Smoke extract vent
  • Car park vent
  • BMS system
  • All electrical containment within basements –B1 and –B2
  • Basement sub-main distribution from landlords’ panel to designated plant rooms
  • Provision of LV panels, mechanical and landlords distribution boards within designated switch rooms/plant rooms E, G and K level –B1. F, H and J level-B2
  • Lighting and power to basement areas
  • ATS panels where required (car park smoke vent)

In Block J and Ancillaries, we have been responsible for the design and build. We progressed the design from RIBA stage 3 to RIBA stage 5, delivering essential infrastructure including:

  • Nurse Call System available for each individual apartment if requested
  • Orcomm home automation system with Concierge integration
  • Wireless Access Point
  • Apartment fire suppression systems
  • Water Leak Detection within all bathrooms, kitchens and mechanical cupboards
  • Fire stopping solution in conjunction with St Edwards site operating procedures
  • Viega Pipework including smart press within all apartments
  • Rainwater Harvesting system for the site wide irrigation system
Solution detail

We have delivered a fully integrated Independent Connection Provider (ICP) service at Royal Warwick Square, which is aligned with our strategic move into the ICP market, alongside our history of creating long term partnerships with key clients. Our experience of working alongside developers and consultants in the design and delivery of large scale mixed-used low carbon infrastructure projects enables us to take full ownership for the successful delivery of the electricity infrastructure.

We have delivered a fully integrated multi-utility approach to the delivery of the entire energy infrastructure at Royal Warwick Square, aligning our ICP service offerings with the delivery of the heating and cooling infrastructure; therefore ensuring a single point of responsibility which combines the outputs of the numerous procurement processes. This allowed us to work quickly to get power on, ensuring project efficiency through collaboration, value for money, standardisation and optimisation, and we are proud to have delivered a hassle free ICP service to St. Edwards.

Key Benefits

  • We worked closely with St Edward in order to create a construction schedule to minimise disruption to other contractors on site.
  • As market leaders in the delivery of low carbon energy infrastructure for residential and mixed-use developments, we brought a long-term whole system integrated energy approach to multi-utility delivery that can generate efficiencies, such as meeting time compressed deadlines, as well as savings to all parties.
  • Engineering excellence. Using our in-house and supply chain expertise and experience, we delivered sustainability, resilience and affordability goals.
  • A number of graduates and apprentices have been involved in this project, which has equipped them with on the hands-on experience and boosted their skills.
  • The in-house design team has developed the original design concept to a full stage 5 design